top of page
robot.jpg
boring m.jpg
cnc.jpg
plasma.jpg
powder.jpg
press.jpg

INFRASTRUCTURE

Our state-of-the-art manufacturing facility is designed for scale. With a total area spanning over 16000 sq.ft. integrating fabrication, machining, assembly and painting under one roof, and coupled with an immensely skilled workforce managed by Skilled Engineers.

PRESS SHOP

​PRESS 150TN (2-Point) Pneumatic

PRESS 100TN Pneumatic

PRESS 100TN (2-POINT) MECHANICAL 

PRESS 50TN 

PRESS 30TN

​

​

​​


press.jpg

WELD SHOP

MIG Welding

ROBOT Welding

Double end Welding

ARC Welding

​

​

robot.jpg

CUTTING FACILITIES

PLASMA Cutting 

  • 3000x10000 mm Bed Size

  • Cutting Depth-20 mm Plasma and 100 mm OXY Cut

Iron worker

Band saw

General cutting tools

plasma.jpg

BORING FACILITIES  

​

​

Double end Boring Machine

boring m.jpg

SURFACE TREATMENT

Powder Coating (7000x2500x2000 mm)

LIquid Painting Air Dry​

Shot Blasting​ (7000x2500x2000mm)

​

powder.jpg

TOOL ROOM

Vertical Machining Centre (HASS)

Lathe MAchine (8Ft, 10Ft, 16Ft )

M1TR With DRO

Shaper

Milling Machine

Genral Tool Machine

​

​

cnc.jpg

TEST FACILITIES AND QUALITY ROOM

Water Spray Test

Dust Test

General Test Tools

​

​

maxresdefault.jpg
150tone.jpg

Bending Machine

Hindustan Hydraulics EHP 150

  • Facebook
  • Twitter
  • LinkedIn

©2020 by LA AAKAR'S METALTECH. Proudly created with Wix.com

bottom of page